B2B: Student Conflicts Processing – Additional Check for Scheduled Task data (3.69)

Description

An additional check is now performed when receiving Scheduled Task data.  This determines whether blocks of data for each incoming student are the same as in previous scheduled task.

  • If the same, the incoming data is not passed to the DPRs.  This prevents the same conflict being generated multiple times.
  • If there are differences, the entire block of data is processed by the DPRs for that student (as per existing functionality).

A scheduled task has been created in v4 client | Scheduled Tasks to routinely clear the cache in line with LA’s local data retention policy.

Click image to enlarge. Use browser back button to return.

Documents Updated

B2B Student Handbook

How would you rate the information provided on this page?

If it's not 5 stars please provide feedback to help us improve it

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Please provide feedback on this post to help improve it

Tell us how we can improve this post?