The instructions on this page were different in the following release(s):
3.823.803.76

scheduled tasks

| Scheduled TasksHeader Section | Scheduled Tasks tab | Task Log tab | Add a new scheduled task | Historic SEND |

  1. Select the Task Log tab.
  2. Choose from the following options:
    • Click the Wide View hyperlink to see the list of tasks in a wide view if required.
    • Click the Scheduled Task Name hyperlink to view the Task Details tab for the selected task.

When viewing the details of a scheduled task that has been assigned to run in term time or holiday time only, One displays that the task has run, even if the task should not have run (because it is not term time or holiday time). This occurs because One is not aware of the school’s term and holiday dates. If a scheduled task attempts to run when it should not, Wonde will not send the requested data.